An empty office chair beside a desk lit by a single lamp, with a half-finished coffee, an open notebook, and an ID badge left behind, in a dark and empty office

Too Picky

The AI tools I build software with have told me, more than once and very politely, that I am too picky. It is a fair description. I check references I have already checked. I go back to work that is finished and fix flaws nobody else would ever notice.

It has cost me more evenings than I would like to count. But for most of my career, that habit also filled gaps in the organizations I worked for: work that needed doing, but that nobody had been given the time or the responsibility to do.


The work nobody assigned

The habit took different forms depending on the role. I reviewed whether process and procedure were actually being followed, as opposed to whether they existed. I built performance metrics where none had been designed, and managed them where none had been managed. When the numbers showed that the procedures and the work no longer fit each other, I adjusted one or both. I reworked project plans in the evening to take out steps that cost time and bought nothing. I moved resources to where the work actually was. When I saw a deficiency, I fixed it, often before it was large enough for anyone else to notice.

I also went back after changes. A change can be well planned, cleanly implemented, and work exactly as designed, and still not fix the problem everyone was complaining about. The ticket says successful because the change was successful. Whether the complaint went away is a different question, and I got in the habit of asking it.

Very little of that is exotic. Most of it is ordinary good practice, the kind any framework includes. It is also the first thing cut in a busy shop, because its absence leaves no mark. A skipped review produces no incident. An unmanaged metric sets off no alarm. The cost arrives later, somewhere else, under another name. Work that sets off no alarm when it is neglected is easy to leave unfunded, and it is the first to go when the hours run short.


What the habit was doing

I am working on an app right now with a great deal of animation in it. Each animated element runs on a harness: a set of bones and joints that the animation engine moves. It is easy to put a flex point in the wrong place, and nothing tells you that you have. The only way to find it is to run every frame of every animation, through every interaction a user can trigger, and watch. That is a lot of frames. Where a sound goes with a motion, it has to land exactly on that motion, and the more complex the movement, the harder that synchronization becomes. Once the animations behaved properly, I went through the assets themselves, reduced every one, and measured memory consumption and processor load to see what the reductions bought. Some of it will show up as battery life, as smoothness on older hardware, as an app that answers the moment it is touched. No user will know any of it happened. I noticed.

The conversation about people like this treats the standard as a personality trait. In one version it is a virtue: diligence, pride in the work. In the other it is a liability, and the advice is to stop. Protect your evenings. Let good enough be enough. Both versions describe a temperament, and neither asks what it was doing inside the organization. Doing that work on my own time was my choice, and I am not prescribing it to anyone. But inside an organization, a disposition that reliably produces work the organization needs is no longer a matter of character. It is capacity. Capacity nobody budgeted for is a staffing gap with a person standing in it.


They knew

The easy version of this story is that the work was invisible and nobody knew. That is not what happened.

I made sure the people in a position to change things knew what I was doing and why: which procedures were not being followed, which metrics did not exist, which plans had slack in them. The work was not hidden from anyone who could have staffed it. It probably had something to do with how quickly I was promoted.

They did not staff it. They promoted me.

From the inside, that feels like the system working. The problem was seen, the person addressing it was rewarded, and the reward was real. But a promotion is also a decision about the problem, and the decision was to leave it where it was. The gap had someone in it. I doubt anyone consciously weighed headcount against a raise. The assumption seemed to be that I would take care of it, or that my replacement would naturally do so in my place.

That is the pattern behind Technical Debt is Usually Leadership Debt: the decision that matters is made at the top and recorded nowhere. This one was recorded in a performance review, as praise.


The calls followed me up

Every promotion moved me further from the place the work was needed. The procedure checks, the metrics, the plans tightened at night belonged to the level I had just left. Nobody at that level was given the time to do them, so they went undone.

Quality dropped behind me, and then the calls came. Something had slipped, a project had stalled, a process had drifted, and I was asked to step in and fix it. I did. Each rescue looked like proof the arrangement worked: the problem surfaced, the right person was sent, the problem went away. Each one also confirmed that nothing needed to change.

The people left behind were not the problem. They had the same hours everyone else had, and none of those hours had been set aside for this work. What they lacked was not rigor. It was the hours I had been giving away, the kind of donation that, as Always On argued, no metric records.


What leaves with the person

An organization that runs this way believes it has a capability. Its processes appear to produce quality. Its metrics, where they exist, look healthy. Its projects land. What it actually has is a person, and a habit of calling that person when something breaks.

The person leaves eventually. Sometimes it is a promotion, sometimes a lateral move to another team, sometimes a reduction in force. The last is the most dangerous. Cuts are planned from the org chart and the cost line, and neither one shows work nobody assigned. A position can look expendable on paper even when the person in it has been quietly holding up far more than its description. The organization lets go of the people doing the work because it never fully understood what that work was.

However they go, the organization loses something it never recorded owning. The processes that remain are the ones that were there all along, and they were never able to do what they were credited with. Nobody can say exactly what went missing, because none of it was written down as a function. It was written down as a strength, in someone’s review.

They thought they were promoting the standard. They were promoting the only place it was kept.


Discover more from At Ground Level

Subscribe to get the latest posts sent to your email.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *